Lionel Trains - Lionel Train Forum - Model Train Forum
General Lionel & Model Train Discussion => General Lionel Model Train Discussion => Topic started by: tim72 on December 03, 2019, 06:47:57 pm
-
You can run Command or non-Command locomotives on a layout while having Command or non-Command locomotives on a siding. You can cut the power to the siding using a simple switch.
See this video for an explanation and demonstration of this procedure.
https://www.youtube.com/watch?v=ctOEdqs7irM
Larry
-
Can a non Command control locomotive be put to sleep in a siding while you run a Command control train on the rest of the layout ? Can the remote control switch control the power to the siding ? if not how do i do it and is there a description or pdf. on how to accomplish it ?